Responsibilities- To handle project as assigned by HOD. To manage properly every stage based on cust. master schedule.
- To ensure clear understanding all customer requirement and ensure all doc. or samples submit on time.
- To self plan and implement daily progress of product development in order to meet every customer event.
- To prepare own schedule based on master schedule to detail out all the sub activity to get quality document and
physical job run concurrently.
i) Customer main event delivery date.
ii) All tooling fabrication must meet T-0, T-1 etc
iii) Material for trial must be ready before tooling ready for T-0
iv) CF or inspection jig must be ready before tooling ready for T-0
v) Quality document for inspection must be ready and review before tooling ready for T-0
vi) Assembly method must be define before Tooling ready for T-0
vii) If required temporary assy method, required dateline
viii) Submit child part sample to supplier before tooling ready for T-0
ix) Machine for trial must be clear either use aker facilities or IQMSB facilities
- To communicate with customer frequently, update regarding project progress.
- Gemba respective plant, tooling maker, supplier to ensure progress on schedule.
- Involve in mould/design review in order to assits on the design concept.
- Involve in manufacturing process planning with cistomer and dies design review.
- To identify testing needed to conduct for specific part.
Job Types: Full-time, Permanent, Fresh graduate
Pay: RM2,000.00 - RM3,500.00 per month
Benefits: - Opportunities for promotion
Professional development
Schedule: Monday to Friday
On callSupplemental pay types: Performance bonus
Ability to commute/relocate:
- Shah Alam: Reliably commute or planning to relocate before starting work (Preferred)
Willingness to travel:
* 25% (Preferred)