Job Responsibilities:- Remove Mold During Product Change
Pre-Stage all equipment and necessary tools for mold removal- Obtain all necessary supplies from stores prior to removing mold
Remove mold and all mold accessories from the machine
Prepare the mold to be transported to the tool room- Install Mold During Product Change
Pre-Stage Mold at machine
- Obtain necessary supplies from stores, vendors, or suppliers prior to installation by placing product orders
Install the new mold by following proper procedures- Troubleshoot mold issues during installation process
Prepare for Storage and Installation
- Follow the lock out, tag out (LOTO) procedure
Inspect the mold out for repairs, tool wear, and damage- Perform repairs and clean the mold prior to storage
Store the mold in the proper location
- Inspect, clean, polish the mold prior to installation
Repair and Improve Injection Molds During Production- Troubleshoot molds during production to ensure optimum performance
Check mold alignment
- Split any mold to perform the following:
Replace or clean tips Clean mold (flash)
Clean cavity air- Block and unblock cavities when the need arises
Perform insert change or repairs, clean cores and gate inserts
Perform Routine Preventative Maintenance- Replace mold inserts, nozzle tips,
Check lubrication points
- Setting and checking mold alignment
Complete the product change form as molds are changed and rotated- Report daily activities and update Tool Room labor board file.
Complete a mold Inspection checklist as needed
Job Types: Full-time, Permanent
Pay: RM2,
- 00 - RM3,500.00 per month